Events - Event View
This is the "Event Detail" view, showing all available information for this event.
If registration is required or recommended, click the 'Register Now' button to start the process.
If the event has passed, click the "Event Report" button to read a report and view photos that were uploaded.
CSR: Big T Lollipop
Registration is required
Registration cancellations will be accepted until Friday, December 15, 2023 at 1:00 PM
Join us for our last Club Supported Ride (CSR): Big T Lollipop for 2023 on Saturday, December 16, for a challenging and beautiful ride over the San Gabriel Mountains and up the far side to Angeles Crest Highway. You will be surrounded by peaks over 6,000' as you wind your way up and over Clear Creek Junction. You will enjoy the long rolling turns along Angeles Forest Highway as you work your way out to the base of Upper Big Tujunga Canyon. This section is where the work is as you will have many rises and descents along the way, but it is mostly uphill to ACH amid a more dense section of trees. Then it's ACH back to Red Box where we'll have lunch, provided by your SAG team. An easy descent back to Descanso Gardens and you will have been able to experience some the grandeur and beauty of the San Gabriel Mountains!
This month's PAA CSR ride is supported in part by:
ROUTE LENGTHS, ELEVATION, ROUTE LINKS
Miles:
Elevation:
START/END LOCATION
Descanso Gardens
1418 Descanso Dr
La Cañada Flintridge, CA 91101
ROLLING TIME
8 a.m. All groups start
RIDE ORGANIZER
SAG VOLUNTEERS
We're looking for volunteers
SAG LOCATIONS & TIMES
SAG 1: Clear Creek (mile 12); SAG volunteer will be there between 8:45 a.m. - 10 a.m.
SAG 2: Ranger Station before AFF and Upper T Intersection (mile 19); SAG volunteer will be there between 9:15 a.m. - 11 a.m.
Lunch SAG: Red Box (mile 36); SAG volunteer will be there between 10:15 a.m. - 12:30 p.m.